1 | A new branch and bound algorithm for loading problems in flexible manufacturing systems Kim, Yeong-Dae; Yano, C.A., INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, v.6, no.4, pp.361 - 381, 1994-10 |
2 | (A) study on a tool provisioning problem in a flexible manufacturing system with an automatic tool transporter = 공구이송이 가능한 유연제조시스템에서의 복제 공구수 결정에 관한 연구link Jun, Hong-Bae; 전홍배; et al, 한국과학기술원, 1997 |
3 | DDR 알고리즘에 기반한 교착상태배제 래더다이어그램 설계 차종호; 조광현, 제어.로봇.시스템학회 논문지, v.8, no.8, pp.706 - 712, 2002-08 |
4 | Deadlock-free scheduling of photolithography equipment in semiconductor fabrication Yoon, HJ; Lee, Doo Yong, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.17, no.1, pp.42 - 54, 2004-02 |
5 | Determination of part input groups and sequences in flexible manufacturing systems = 유연 제조 시스템에서의 가공품 투입 집합 및 순서 결정에 관한 연구link Yoon, Chi-Moon; 윤치문; et al, 한국과학기술원, 1998 |
6 | Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter Roh, HK; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.35, pp.2989 - 3003, 1997 |
7 | Due-date based loading and scheduling methods in a flexible manufacturing system with an automatic tool transporter = 공구이송이 가능한 유연제조시스템에서 납기를 고려한 부품과 공구 할당 및 일정 계획에 관한 연구link Roh, Hwan-Kyun; 노환균; et al, 한국과학기술원, 1996 |
8 | Object-oriented graphical modeling of FMSs Choi, Byoung Kyu; Han, KH; Park, TY, INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, v.8, no.2, pp.159 - 182, 1996-04 |
9 | Part-mix allocation in a hybrid manufacturing system with a flexible manufacturing cell and a conventional jobshop Lee, DH; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.34, no.5, pp.1347 - 1360, 1996-05 |
10 | Scheduling algorithms for flexible manufacturing systems with partially grouped machines Lee, DH; Kim, Yeong-Dae, JOURNAL OF MANUFACTURING SYSTEMS, v.18, no.4, pp.301 - 309, 1999 |
11 | Time-Feasible Reachability Tree for Noncyclic Scheduling of Timed Petri Nets Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.3, pp.1007 - 1016, 2015-07 |
12 | Tool requirements planning in a flexible manufacturing system with an automatic tool transporter Kim, Yeong-Dae; Lee, GC; Choi, SK; Lim, SK, IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, v.17, no.6, pp.795 - 804, 2001-12 |
13 | Tool requirements planning in a flexible manufacturing system with an automatic tool transporter = 공구 이송이 가능한 유연제조시스템에서 공구 소요 계획link Choi, Seong-Kook; 최성국; et al, 한국과학기술원, 1999 |
14 | Toot requirements planning in a flexible manufacturing system: minimizing tool costs subject to a makespan constraint Kim, Yeong-Dae; Lee, GC; Lim, SK; Choi, SK, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.41, no.14, pp.3339 - 3357, 2003-09 |
15 | 가상 FMS의 Task 정의 및 실행 = Task definition and execution for a virtual FMSlink 양병운; Yang, Byung-Woon; et al, 한국과학기술원, 2000 |