172401 | Scheduling method and apparatus of wireless communication system Kim, Yohan; Chong, Song; Kim, Eunyong; Jeon, Joseph; Choi, Okyoung; Lee, Changsik, 2019-07-16 |
172402 | Scheduling method with the consideration of machine setup in flexible manufacturing systems Yim, SJ; Lee, Doo Yong, Proceedings of the 1997 IEEE International Conference on Robotics and Automation, ICRA. Part 4 (of 4), pp.2735 - 2740, IEEE, 1997-04-20 |
172403 | Scheduling methods with transmit power constraint for CDMA packet services Yoon J.-H.; Sheen M.-J.; Park, Sin Chong, 57th IEEE Semiannual Vehicular Technology Conference (VTC2003), v.57, pp.1450 - 1453, 2003-04-22 |
172404 | Scheduling Model for Refinery Processes of Actual Size Considering Supply Chain Management Song, Jehoon; Park, Hyungjin; Lee, Dong-Yup; Park, Sunwon, KIChE Spring Meeting, pp.565 - 568, KIChE, 2001 |
172405 | Scheduling MOdels in the Semiconductor Industries Park, Sunwon, 96 KACC, KACC, 1996-01-01 |
172406 | Scheduling of a dual-armed cluster tool with two independent robot arms Tonke, Daniel; Lee, Tae-Eog, IEEE Conference on Automation Science and Engineering, IEEE, 2012-08-22 |
172407 | Scheduling of a dual-armed cluster tool with two independently working robot arms = 독립적으로 움직이는 두 로봇 팔을 갖는 양팔 클러스터 장비의 스케줄링link Tonke, Daniel; Tonke, H.D.; et al, 한국과학기술원, 2010 |
172408 | Scheduling of a Flow Shop without Intermediate Queues but with Job Holders Required for Processing Sung, Chang Sup, pp.0 - 0, 1993-04-01 |
172409 | Scheduling of actual size refinery processes considering environmental impacts with multiobjective optimization Song, J; Park, H; Lee, DY; Park, Sunwon, INDUSTRIAL ENGINEERING CHEMISTRY RESEARCH, v.41, no.19, pp.4794 - 4806, 2002-09 |
172410 | Scheduling of arc welding robot considering heat-caused distortion = 열변형을 고려한 아크용접 로봇의 스케줄링link Kim, Hwa-Jung; 김화중; et al, 한국과학기술원, 2002 |
172411 | Scheduling of Batch Manufacturing Process in the Chemical Plants Park, Sunwon, The 14th KACC, KACC, 1999-01-01 |
172412 | Scheduling of Batch Manufacturing Process in The Chemical Plants with An Optimal Control Approach Park, Sunwon, The 12th Symposium on Chemical Engineering, pp.175 - 176, 1999-01-01 |
172413 | Scheduling of Cluster Tools with Complex Scheduling Requirements Yu, Tae Sun; Lee, Tae-Eog, 20th Conference of the International Federation of Operational Research Societies, IFORS, 2014-07-15 |
172414 | Scheduling of cluster tools with independent dual-arm under wafer delay constraints = 체재시간 제약을 가지는 독립된 두 팔 클러스터 장비의 스케줄링link Kwon, Yongmin; Lee, Tae-Eog; et al, 한국과학기술원, 2017 |
172415 | Scheduling of cluster tools with k-periodic chamber cleaning operationslink Lee, Tae-Gyung; Lee, Tae-Eog; et al, 2021 |
172416 | Scheduling of cluster tools with ready time constraints for small lot production Lee, Tae-Eog; Kim, Hyun-Jung, IEEE 2011 International Conference on Automation Science and Engineering, pp.96 - 101, IEEE, 2011-08-25 |
172417 | Scheduling of dual independent armed cluster tool with unbalanced workload = 독립적인 두팔을 가진 클러스터 장비의 불균형한 워크로드 스케쥴링link Sheen, Dong Yup; 신동엽; et al, 한국과학기술원, 2015 |
172418 | Scheduling of Dual-armed Cluster Tools with 2-cyclic Chamber Cleaning Operations 이태경; 이태억, 2018춘계공동학술대회, 대한산업공학회, 2018-04-05 |
172419 | Scheduling of Dual-armed Cluster Tools with k-periodic Chamber Cleaning LEE, TAE GYUNG; Lee, Tae-Eog, 2018 대한산업공학회 추계학술대회, pp.747 - 777, 대한산업공학회, 2018-11-09 |
172420 | Scheduling of Dual-Armed Cluster Tools with Time Constraints Kim, Ja-Hee; Lee, Tae-Eog; Lee, Hwan-Yong, MASM, pp.1 - 6, 2002-04 |