Researcher Page

사진

Lee, Tae-Eog (이태억) C-2016-2011

Department
Department of Industrial & Systems Engineering(산업및시스템공학과)
Co-author
Collaboration Network Collaboration Network
Website
http://simlab.kaist.ac.krHomePage
Research Area
Discrete Event System Scheduling & Control, Scheduling & Control of Cluster Tools, Defense Modeling & Simulation

Keyword Cloud

Reload 더보기
1

Scheduling Single-Armed Cluster Tools With Chamber Cleaning Operations

Yu, Tae Sun; Kim, Hyun-Jung; Lee, Tae-EogresearcherIEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INCIEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.15, no.2, pp.705 - 716, 2018-04

2

Minimization of Waiting Time Variation in a Generalized Two-Machine Flowshop With Waiting Time Constraints and Skipping Jobs

Yu, Tae Sun; Kim, Hyun-Jung; Lee, Tae-EogresearcherIEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INCIEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.30, no.2, pp.155 - 165, 2017-05

3

Characterizing Token Delays of Timed Event Graphs for K-Cyclic Schedules

Lee, Tae-Eogresearcher; Kim, Hyun-Jung; Roh, Dong-Hyun; Sreenivas, Ramavarapu S.IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INCIEEE TRANSACTIONS ON AUTOMATIC CONTROL, v.62, no.2, pp.961 - 966, 2017-02

4

LVC 연동을 위한 VR 탱크 시뮬레이터 구현

강석일; 이태억researcher; 이창조한국엔터테인먼트산업학회한국엔터테인먼트산업학회논문지, v.11, no.1, pp.265 - 273, 2017-01

5

Optimal scheduling for sequentially connected cluster tools with dual-armed robots and a single input and output module

Kim, Dae-Kyu; Kim, Hyun-Jung; Lee, Tae-EogresearcherTAYLOR & FRANCIS LTDINTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.55, no.11, pp.3092 - 3109, 2017

6

훈련시뮬레이션에서의 지휘통제 모델링

윤우섭; 한봉규; 이태억한국시뮬레이션학회한국시뮬레이션학회 논문지, v.25, no.4, pp.117 - 126, 2016-12

7

Schedulability Analysis for Noncyclic Operation of Time-Constrained Cluster Tools With Time Variation

Kim, Hyun Jung; Lee, Jun-Ho; Lee, Tae-EogresearcherIEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INCIEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.3, pp.1409 - 1414, 2016-07

8

Feedback Control of Cluster Tools for Regulating Wafer Delays

Kim, Chulhan; Lee, Tae-EogresearcherIEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INCIEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.2, pp.1189 - 1199, 2016-04

9

Modeling, Analysis, and Scheduling of Cluster Tools With Two Independent Arms

Tonke, Daniel; Lee, Tae-EogresearcherIEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INCIEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.2, pp.1176 - 1188, 2016-04

10

Optimal Scheduling of Transient Cycles for Single-Armed Cluster Tools With Parallel Chambers

Kim, Dae-Kyu; Lee, Tae-Eogresearcher; Kim, Hyun-JungIEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INCIEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.2, pp.1165 - 1175, 2016-04

11

Scheduling cluster tools for concurrent processing of two wafer types with PM sharing

Lee, Jun-Ho; Kim, Hyun-Jung; Lee, Tae-EogresearcherTAYLOR & FRANCIS LTDINTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.53, no.19, pp.6007 - 6022, 2015-10

12

Agent-Based Simulation of Time to Decide: Military Commands and Time Delays

Yun, Woo Seop; Moon, Il-Chulresearcher; Lee, Tae EogresearcherJ A S S SJASSS-THE JOURNAL OF ARTIFICIAL SOCIETIES AND SOCIAL SIMULATION, v.18, no.4, 2015-10

13

Time-Feasible Reachability Tree for Noncyclic Scheduling of Timed Petri Nets

Kim, Hyun-Jung; Lee, Jun-Ho; Lee, Tae-EogresearcherIEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INCIEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.3, pp.1007 - 1016, 2015-07

14

Scheduling In-Line Multiple Cluster Tools

Kim, Hyun-Jung; Lee, Jun-Ho; Baik, Sunhee; Lee, Tae-EogresearcherIEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INCIEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.28, no.2, pp.171 - 179, 2015-05

15

Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm

Kim, Hyun-Jung; Lee, Jun-Ho; Lee, Tae-EogresearcherIEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INCIEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.2, pp.690 - 700, 2015-04

16

Modelling and Simulation of a River-Crossing Operation via Discrete Event Simulation with Engineering Details

Jung, Chungjo; Yun, Woo-Seop; Moon, Il-Chulresearcher; Lee, Tae-EogresearcherDEFENCE SCIENTIFIC INFORMATION DOCUMENTATION CENTREDEFENCE SCIENCE JOURNAL, v.65, no.2, pp.135 - 143, 2015-03 View PDF (2612kb)

17

A Branch and Bound Algorithm for Cyclic Scheduling of Timed Petri Nets

Jung, Chihyun; Kim, Hyun-Jung; Lee, Tae-EogresearcherIEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INCIEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.1, pp.309 - 323, 2015-01

18

Non-Cyclic Scheduling of a Wet Station

Kim, Hyun-Jung; Lee, Jun-Ho; Lee, Tae-EogresearcherIEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INCIEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.11, no.4, pp.1262 - 1274, 2014-10

19

Schedule Restoration for Single-Armed Cluster Tools

Kim, Ja-Hee; Zhou, MengChu; Lee, Tae-EogresearcherIEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INCIEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.27, no.3, pp.388 - 399, 2014-08

20

효율적인 육군항공과 포병자산의 통합화력 운용방안 판단을 위한 모델링 방법론 및 분석구

임종원; 권혁래; 이태억researcher한국시뮬레이션학회한국시뮬레이션학회 논문지, v.23, no.2, pp.47 - 55, 2014-06

Load more items
Loading...

rss_1.0 rss_2.0 atom_1.0