Researcher Page

사진

Kim, Yeong-Dae (김영대) C-2006-2011

Department
Department of Industrial & Systems Engineering(산업및시스템공학과)
Co-author
Collaboration Network Collaboration Network
Website
http://ie1.kaist.ac.kr/~ydkimHomePage
Research Area
Manufacturing system design & operation , Production planning and scheduling in supply chains, Operations scheduling

Keyword Cloud

Reload 더보기
1

Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times

An, Young-Jin; Kim, Yeong-Daeresearcher; Choi, Seong-WooPERGAMON-ELSEVIER SCIENCE LTDCOMPUTERS & OPERATIONS RESEARCH, v.71, pp.127 - 136, 2016-07

2

Design and operation of a two-level supply chain for production-time-dependent products using Lagrangian relaxation

Han, Jun-Hee; Kim, Yeong-DaeresearcherPERGAMON-ELSEVIER SCIENCE LTDCOMPUTERS & INDUSTRIAL ENGINEERING, v.96, pp.118 - 125, 2016-06

3

Algorithms for Aircraft Flight and Maintenance Scheduling in an Army Aviation Unit

Lee, Dong-Hoon; Jeong, Bong-Joo; Kim, Bong-Kyun; Lee, Ju-Yong; Jang, Sebong; Kim, Yeong-DaeresearcherMILITARY OPERATIONS RESEARCH SOCMILITARY OPERATIONS RESEARCH, v.21, no.3, pp.5 - 17, 2016

4

A branch and bound algorithm to minimize total tardiness of jobs in a two identical-parallel-machine scheduling problem with a machine availability constraint

Lee, Ju Yong; Kim, Yeong-DaeresearcherPALGRAVE MACMILLAN LTDJOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.66, no.9, pp.1542 - 1554, 2015-09

5

Finding a risk-constrained shortest path for an unmanned combat vehicle

Bae, Kyung-Yeol; Kim, Yeong-Daeresearcher; Han, Jun HeePERGAMON-ELSEVIER SCIENCE LTDCOMPUTERS INDUSTRIAL ENGINEERING, v.80, pp.245 - 253, 2015-02

6

Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times

Jeong, Bong Joo; Kim, Yeong-DaeresearcherPERGAMON-ELSEVIER SCIENCE LTDCOMPUTERS & OPERATIONS RESEARCH, v.47, pp.72 - 80, 2014-07

7

Multiple-criterion shortest path algorithms for global path planning of unmanned combat vehicles

Han, Du-Hyun; Kim, Yeong-Daeresearcher; Lee, Ju YongPERGAMON-ELSEVIER SCIENCE LTDCOMPUTERS & INDUSTRIAL ENGINEERING, v.71, pp.57 - 69, 2014-05

8

A Lagrangian heuristic algorithm for a public healthcare facility location problem

Kim, Dong-Guen; Kim, Yeong-DaeresearcherSPRINGERANNALS OF OPERATIONS RESEARCH, v.206, no.1, pp.221 - 240, 2013-07

9

Scheduling healthcare services in a home healthcare system

An, Y-J; Kim, Yeong-Daeresearcher; Jeong, B. J.; Kim, S-DPALGRAVE MACMILLAN LTDJOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.63, no.11, pp.1589 - 1599, 2012-11

10

Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance

Lee, Ju-Yong; Kim, Yeong-DaeresearcherPERGAMON-ELSEVIER SCIENCE LTDCOMPUTERS OPERATIONS RESEARCH, v.39, no.9, pp.2196 - 2205, 2012-09

11

Heuristics for determining a patrol path of an unmanned combat vehicle

Park, Chul-Hwan; Kim, Yeong-Daeresearcher; Jeong, BongJooPERGAMON-ELSEVIER SCIENCE LTDCOMPUTERS & INDUSTRIAL ENGINEERING, v.63, no.1, pp.150 - 160, 2012-08

12

Heuristics for locating two types of public health-care facilities

Kim, Dong-Geun; Kim, Yeong-Daeresearcher; Lee, Taesikresearcher대한산업공학회INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, v.11, no.2, pp.202 - 214, 2012-06

13

Multiproduct Lot Merging-Splitting Algorithms for Semiconductor Wafer Fabrication

Bang, June-Young; Kim, Yeong-Daeresearcher; Choi, Seong-WooIEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INCIEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.25, no.2, pp.200 - 210, 2012-05

14

Inventory control in a two-level supply chain with risk pooling effect

Kang, Jae-Hun; Kim, Yeong-DaeresearcherELSEVIER SCIENCE BVINTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.135, no.1, pp.116 - 124, 2012-01

15

Heuristic algorithms for assigning and scheduling flight missions in a military aviation unit

Kim, Bong-Kyun; Kim, Yeong-DaeresearcherPERGAMON-ELSEVIER SCIENCE LTDCOMPUTERS INDUSTRIAL ENGINEERING, v.61, no.4, pp.1309 - 1317, 2011-11

16

Scheduling algorithms for a semiconductor probing facility

Bang, June-Young; Kim, Yeong-DaeresearcherPERGAMON-ELSEVIER SCIENCE LTDCOMPUTERS & OPERATIONS RESEARCH, v.38, no.3, pp.666 - 673, 2011-03

17

Scheduling Algorithms for Minimizing Tardiness of Orders at the Burn-in Workstation in a Semiconductor Manufacturing System

Kim, Yeong-Daeresearcher; Kang, Jae-Hun; Lee, Gyeong-Eun; Lim, Seung-KilIEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INCIEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.24, no.1, pp.14 - 26, 2011-02

18

Scheduling algorithms for an air conditioner manufacturing system composed of multiple parallel assembly lines

Choi, YC; Kim, Yeong-Daeresearcher; Bang, JYSPRINGER LONDON LTDINTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, v.51, pp.1225 - 1241, 2010-12

19

Fire scheduling for planned artillery attack operations under time-dependent destruction probabilities

Cha, YH; Kim, Yeong-DaeresearcherPERGAMON-ELSEVIER SCIENCE LTDOMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, v.38, pp.383 - 392, 2010-10

20

A branch and bound algorithm for determining locations of long-term care facilities

Kim, Dong-Guen; Kim, Yeong-DaeresearcherELSEVIER SCIENCE BVEUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.206, no.1, pp.168 - 177, 2010-10

Load more items
Loading...

rss_1.0 rss_2.0 atom_1.0