Researcher Page

사진

Sung, Chang Sup (성창섭)

Department
Department of Industrial & Systems Engineering(산업및시스템공학과)
Website
http://orlab.kaist.ac.krHomePage
Research Area

Keyword Cloud

Reload 더보기
1

Maximizing total job value on a single machine with job selection

Eun, Joonyup; Sung, Chang Supresearcher; Kim, Eun-Seok, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.68, no.9, pp.998 - 1005, 2017-09

2

다수 고객 통합전략을 활용하는 생산 및 물류계획 수립

노경완; 성창섭researcher; 이익선, 경영과학, v.31, no.3, pp.13 - 26, 2014-11

3

A three-level supply chain network design model with risk-pooling and lead times

Park, Sukun; Lee, Tae-Eogresearcher; Sung, Chang Supresearcher, TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, v.46, no.5, pp.563 - 581, 2010-09

4

Makespan minimization for a 2-stage assembly scheduling problem subject to component available time constraint

Sung, Chang Supresearcher; Juhn, Jaeho, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.119, no.2, pp.392 - 401, 2009-03

5

Scheduling of parallel machines to minimize total completion time subject to s-precedence constraints

Kim, Eun-Seok; Sung, Chang Supresearcher; Lee, Ik-Sun, COMPUTERS & OPERATIONS RESEARCH, v.36, no.3, pp.698 - 710, 2009

6

Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed

Lee, Ik Sun; Sung, Chang Supresearcher, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.186, no.3, pp.931 - 952, 2008-05

7

Single machine scheduling with outsourcing allowed

Lee, Ik Sun; Sung, Chang Supresearcher, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.111, no.2, pp.623 - 634, 2008-02

8

An exact algorithm for a cross-docking supply chain network design problem

Sung, Chang Supresearcher; Yang, W., JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.59, no.1, pp.119 - 136, 2008-01

9

A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion times

Sung, Chang Supresearcher; Kim, Hyun Ah, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.113, no.2, pp.1038 - 1048, 2008

10

A real-time algorithm for timeslot assignment in ISM system with DVB-RCS

Lee, Ik Sun; Sung, Chang Supresearcher; Jin, Gwang-Ja; et al, ETRI JOURNAL, v.29, no.3, pp.329 - 335, 2007-06

11

A Note on the Reversibility of the Two Stage Assembly Scheduling Problem?

이익선; 윤상흠; 성창섭researcher, MSFE, v.13, no.1, pp.25 - 34, 2007-05

12

Erratum to "Production and Delivery Scheduling with Transportation Mode Selection Allowed" [Journal of the Korean Institute of Industrial Engineers 32(3)(2006) 163-171]

jung keun cho; ik sun lee; chang sup sungresearcher, 대한산업공학회지, v.33, no.1, pp.164 - 165, 2007-03

13

A component-based product data management system

Sung, Chang Supresearcher; Park, Sam Joon, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, v.33, no.5-6, pp.614 - 626, 2007

14

A Combined Approach of Pricing and (S-1,S) Inventory Policy in a Two-echelon Supply Chain with Lost Sales Allowed

chang sup sungresearcher; sun hoo park, 대한산업공학회지, v.30, no.2, pp.146 - 158, 2006

15

Routing for a Multicommodity Traffic Problem with Transmission Delay and Load Balancing Considered

Chang Sup Sungresearcher; Woosuk Yang, TELECOMMUNICATIONS REVIEW, v.15, no.3, pp.548 - 558, 2005-06

16

Fixed pre-assembly scheduling on multiple fabrication machines

Yoon, Sang Hum; Sung, Chang Supresearcher, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.96, no.1, pp.109 - 118, 2005-04

17

Receiver set partitioning and sequencing for multicasting traffic in a WDM lightwave single-hop network

Sung, Chang Supresearcher; Rim, HC, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.55, no.6, pp.630 - 639, 2004-06

18

Integrated service network design for a cross-docking supply chain network

Sung, Chang Supresearcher, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.54, no.12, pp.1283 - 1295, 2003-12

19

Effective Paging Procedure for the Optical Feeder Microcellular System

Sung, Chang Supresearcher; Rim, Hyoun Chul; Lee, Jung Sup, IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, v.52, no.4, pp.837 - 846, 2003-07

20

Minimizing Due Date Related Peformance Measures on Two Batch Processing Machines

Sung, Chang Supresearcher, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.147, no.3, pp.644 - 656, 2003-06

Load more items
Loading...

rss_1.0 rss_2.0 atom_1.0