Yu, Xiaoqun; Xiong, Shuping, Engineering Applications of Artificial Intelligence, v.132, 2024-05
Mahmoudinazlou, Sasan; Kwon, Changhyun, COMPUTERS & OPERATIONS RESEARCH, v.162, 2024-02
Choi, Insu; Koh, Woosung; Koo, Bonwoo; Kim, Woo Chang, ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, v.128, 2024-02
Kim, Hyun-Jung; Lee, Jun-Ho, IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, v.54, no.1, pp.622 - 633, 2024-01
Wong, Vivian Wen Hui; Kim, Sang Hun; Park, Junyoung; Park, Jinkyoo; Law, Kincho H., JOURNAL OF MANUFACTURING SCIENCE AND ENGINEERING-TRANSACTIONS OF THE ASME, v.146, no.1, 2024-01
Kim, Taekyoung; Yu, Xiaoqun; Xiong, Shuping, ERGONOMICS, v.67, no.1, pp.50 - 68, 2024-01
Jung, Jiyoung; Park, Kundo; Cho, Byungjin; Park, Jinkyoo; Ryu, Seunghwa, JOURNAL OF INTELLIGENT MANUFACTURING, v.34, no.8, pp.3623 - 3636, 2023-12
Han, Donghee; Kim, Daehee; Kim, Minsu; Han, Keejun; Yi, Mun Yong, APPLIED INTELLIGENCE, v.53, no.23, pp.29282 - 29299, 2023-12
Li, Binglin; Ahn, Jeongyoun; Yoon, Changwon, JOURNAL OF MACHINE LEARNING RESEARCH, v.24, 2023-12
Lee, Jakyung; Park, Susan; Cho, Mi-hee; Kang, Ji-Won; Kim, Minkyoung; Choi, Suhyeon; Kim, Seok-gyu; Choi, Ji-hee; Han, Keumhee; Kim, Chang-O; Moon, Il-Chul; Choi, Moon; Jang, Soong-nang, BMC HEALTH SERVICES RESEARCH, v.23, no.1, 2023-12
Toot requirements planning in a flexible manufacturing system: minimizing tool costs subject to a makespan constraint Kim, Yeong-Dae; Lee, GC; Lim, SK; Choi, SK, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.41, no.14, pp.3339 - 3357, 2003-09 |
Performance evaluation of channel management on an RNC system in multimedia wireless networks Hwang, Hark, INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, v.34, no.1, pp.73 - 82, 2003-01 |
Sculptured surface NC machining Choi, Byoung Kyu; B.H.Kim; R.B.Jerard, COMPUTER AIDED GEOMETRIC DESIGN, 2002-08 |
Performance Obstacles in Cellular Manufacturing S. Han; Park, Kyung Soo, HUMAN FACTORS AND ERGONOMICS IN MANUFACTURING, v.12, no.1, pp.17 - 29, 2002 |
Comparison of group replacement policies under minimal repair Park, Kyung Soo; Yoo, YK, INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, v.35, no.3, pp.179 - 184, 2004-03 |
Scheduling problem in a two-machine flow line with the N- step prio-fob-dependent set-up times Hwang, Hark, INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, v.32, no.3, pp.375 - 385, 2001-01 |
A returns policy for distribution channel coordination of perishable items Hahn, KH; Hwang, Hark; Shinn, SW, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.152, no.3, pp.770 - 780, 2004-02 |
Integrated service network design for a cross-docking supply chain network Sung, Chang Sup, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.54, no.12, pp.1283 - 1295, 2003-12 |
Optimal pricing and ordering policies for retailers under order-size-dependent delay in payments Shinn, SW; Hwang, Hark, COMPUTERS OPERATIONS RESEARCH, v.30, no.1, pp.35 - 50, 2003-01 |
An integrated model for the design of end-of-aisle order picking system and the determination of unit load sizes of AGVs Hwang, Hark; Moon, S; Gen, M, COMPUTERS INDUSTRIAL ENGINEERING, v.42, no.2-4, pp.249 - 258, 2002-06 |
Scheduling in a Two-machine Flowshop with Batch Processing Machine(s) for Earliness/Tardiness Measure under a Common Due Date Sung, Chang Sup; Min, JI, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.131, no.1, pp.95 - 106, 2001-05 |
Operation-sequence-based Approsch for Designing a U-shaped Independent-Cell System with Machine Requirement Incorporated yeon-ki park; c. s. sung; byung-ho jeong, 한국경영과학회지, v.26, no.1, pp.71 - 85, 2001-03 |
Inventory ratio based production switching heuristic(RPSH) for the aggregate production planning problem Cha, Chun Nam; Hwang, Hark, ASIA PACIFIC MANAGEMENT REVIEW, v.6, no.1, pp.1 - 16, 2001-01 |
A Simple Approach to the Workload Analysis of M/G/1 Vacation Queues Kim, Nam Ki; Park, Yon Il; Chae, Kyung-Chul, JOURNAL OF THE KOREAN STATISTICAL SOCIETY, v.33, no.2, pp.159 - 167, 2004-06 |
Economic design of multi-carousel system based on a recursive optimization/simulation procedure Hwang, Hark; Choi, DW, INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, v.10, pp.449 - 454, 2003-12 |
K-terminal reliability of FDDI ring network with a constrained number of consecutively bypassed stations Park, Kyung Soo; Jung, GW, IEICE TRANSACTIONS ON FUNDAMENTALS OF ELECTRONICS COMMUNICATIONS AND COMPUTER SCIENCES, v.E84-A, no.11, pp.2923 - 2929, 2001-11 |
Operator-scheduling using a constraint satisfaction technique in port container terminals Kim, KH; Kim, KW; Hwang, Hark; Ko, CS, COMPUTERS & INDUSTRIAL ENGINEERING, v.46, no.2, pp.373 - 381, 2004-04 |
A dispatching algorithm for multiple-load AGVS using a fuzzy decision-making method in a job shop environment Kim, DB; Hwang, Hark, ENGINEERING OPTIMIZATION, v.33, no.5, pp.523 - 547, 2001-01 |
A unified queue length formula for BMAP/G/1 queue with generalized vacations Chang, SH; Takine, T; Chae, Kyung-Chul; Lee, HW, STOCHASTIC MODELS, v.18, no.3, pp.369 - 386, 2002 |
The conversion of a dynamic B-spline curve into piecewise polynomials in power form Kim, DS; Ryu, J; Lee, HC; Shin, Hayong, COMPUTER-AIDED DESIGN, v.34, no.4, pp.337 - 345, 2002-04 |
Discover