Browse "IE-Journal Papers(저널논문)" by Title 

Showing results 8 to 27 of 2078

8
A backward approach in list scheduling algorithms for multi-machine tardiness problems

Kim, Yeong-Dae, COMPUTERS AND OPERATIONS RESEARCH, v.22, no.3, pp.307 - 319, 1995-03

9
A Bayesian nonparametric mixture measurement error model with application to spatial density estimation using mobile positioning data with multi-accuracy and multi-coverage

Lee, Youngmin; Jeong, Taewon; Kim, Heeyoung, TECHNOMETRICS, v.62, no.2, pp.173 - 183, 2020-04

10
A berth allocation planning problem with direct transshipment consideration

Liang, Chengji; Hwang, Hark; Gen, Mitsuo, JOURNAL OF INTELLIGENT MANUFACTURING, v.23, no.6, pp.2207 - 2214, 2012-12

11
A bibliography of the literature on process capability indices (PCIs): 2010-2021, Part I: Books, review/overview papers, and univariate PCI-related papers

Yum, Bong-Jin, QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, v.39, no.4, pp.1413 - 1438, 2023-06

12
A bibliography of the literature on process capability indices (PCIs): 2010-2021, Part II: Multivariate PCI- and functional PCI-related papers, special applications, software packages, and omitted papers

Yum, Bong-Jin, QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, v.39, no.4, pp.1439 - 1464, 2023-06

13
A Bibliography of the Literature on Process Capability Indices: 2000-2009

Yum, Bong-Jin; Kim, Kwan-Woo, QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, v.27, no.3, pp.251 - 268, 2011-04

14
A Biomechanical Evaluation of Two Methods of Manual Load Lifting

Park, Kyung Soo, AIIE TRANSACTIONS, v.6, no.2, 1974-06

15
A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints

Park, MW; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.123, no.3, pp.504 - 518, 2000-06

16
A branch and bound algorithm for an identical parallel machine scheduling problem with a job splitting property

Shim, Sang-Oh; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.35, no.3, pp.863 - 875, 2008-03

17
A Branch and Bound Algorithm for Cyclic Scheduling of Timed Petri Nets

Jung, Chihyun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.1, pp.309 - 323, 2015-01

18
A branch and bound algorithm for determining locations of long-term care facilities

Kim, Dong-Guen; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.206, no.1, pp.168 - 177, 2010-10

19
A branch and bound algorithm for locating input and output points of departments on the block layout

Kim, JG; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.50, no.5, pp.517 - 525, 1999-05

20
A Branch and Bound Algorithm for Three-Machine Flow Shop with Overlapping Waiting Time Constraints

Kim, Hyunjung; Lee, JH, IFAC PAPERSONLINE, v.50, no.1, pp.1101 - 1105, 2017-07

21
A branch and bound algorithm to minimize total tardiness of jobs in a two identical-parallel-machine scheduling problem with a machine availability constraint

Lee, Ju Yong; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.66, no.9, pp.1542 - 1554, 2015-09

22
A Branch-and-Bound Algorithm for a Class of Mixed Integer Linear Maximum Multiplicative Programs: A Bi-objective Optimization Approach

Saghand, Payman Ghasemi; Charkhgard, Hadi; Kwon, Changhyun, COMPUTERS & OPERATIONS RESEARCH, v.101, pp.263 - 274, 2019-01

23
A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints

Joo, Byung Jun; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.60, pp.572 - 582, 2009-04

24
A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness

Lee, GC; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.42, pp.4731 - 4743, 2004-11

25
A BRANCH-AND-BOUND APPROACH FOR SPARE UNIT ALLOCATION IN A SERIES SYSTEM

Sung, Chang Sup; LEE, HK, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.75, no.1, pp.217 - 232, 1994-05

26
A branch-and-price algorithm for a targeting problem

Kwon, O; Lee, K; Kang, D; Park, Sungsoo, NAVAL RESEARCH LOGISTICS, v.54, no.7, pp.732 - 741, 2007-10

27
A Branch-and-price algorithm for placement routing for a multi-head beam-type component placement tool

Sun, DS; Lee, Tae-Eog, OR SPECTRUM, v.30, no.3, pp.515 - 534, 2008-06

Discover

Type

Open Access

Date issued

. next

Subject

. next

rss_1.0 rss_2.0 atom_1.0