Browse "IE-Journal Papers(저널논문)" by Title

Showing results 1 to 20 of 1766

1

14면 주사위 확률에 대한 역사적 고찰

채경철researcher; 이충석, 응용통계연구, v.8, no.2, pp.179 - 185, 1995

2

2-DIRECTION SUBGRADIENT METHOD FOR NON-DIFFERENTIABLE OPTIMIZATION PROBLEMS

Kim, Sehunresearcher; KOH, S; AHN, H, OPERATIONS RESEARCH LETTERS, v.6, no.1, pp.43 - 46, 1987-03

3

21C 국가 산업구조 개편과 R&D투자전략에 대한 제언

성창섭researcher, 경영과학, v.17, no.3, pp.1 - 3, 2000-11

4

2단계 서비스와 일반휴가 대기행렬

김태성; 채경철researcher, 대한산업공학회지, v.22, no.1, pp.95 - 104, 1996-03

5

2차원 윤과가공에서 이송률 자동 조정

고기훈; 서정철; 최병규researcher, 한국CAD/CAM학회 논문집, v.5, no.2, pp.175 - 183, 2000-06

6

3D freehand ultrasound reconstruction using a piecewise smooth Markov random field

Moon, Hyungil; Ju, Geonhwan; Park, Seyoun; Shin, Hayongresearcher, COMPUTER VISION AND IMAGE UNDERSTANDING, v.151, pp.101 - 113, 2016-10

7

3차원 물품 적재에 관한 마이크로 컴퓨터용 프로그램 개발

Hwang, Harkresearcher; Lee, Kwan-Jae; Sun, Ji-Ung, 대한산업공학회지, v.23, no.1, pp.55 - 76, 1997

8

A backward approach in list scheduling algorithms for multi-machine tardiness problems

Kim, Yeong-Daeresearcher, COMPUTERS AND OPERATIONS RESEARCH, v.22, no.3, pp.307 - 319, 1995-03

9

A berth allocation planning problem with direct transshipment consideration

Liang, Chengji; Hwang, Harkresearcher; Gen, Mitsuo, JOURNAL OF INTELLIGENT MANUFACTURING, v.23, no.6, pp.2207 - 2214, 2012-12

10

A Bibliography of the Literature on Process Capability Indices: 2000-2009

Yum, Bong-Jinresearcher; Kim, Kwan-Woo, QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, v.27, no.3, pp.251 - 268, 2011-04

11

A Biomechanical Evaluation of Two Methods of Manual Load Lifting

Park, Kyung Sooresearcher, AIIE TRANSACTIONS, v.6, no.2, 1974-06

12

A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints

Park, MW; Kim, Yeong-Daeresearcher, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.123, no.3, pp.504 - 518, 2000-06

13

A branch and bound algorithm for an identical parallel machine scheduling problem with a job splitting property

Shim, Sang-Oh; Kim, Yeong-Daeresearcher, COMPUTERS & OPERATIONS RESEARCH, v.35, no.3, pp.863 - 875, 2008-03

14

A Branch and Bound Algorithm for Cyclic Scheduling of Timed Petri Nets

Jung, Chihyun; Kim, Hyunjung; Lee, Tae-Eogresearcher, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.1, pp.309 - 323, 2015-01

15

A branch and bound algorithm for determining locations of long-term care facilities

Kim, Dong-Guen; Kim, Yeong-Daeresearcher, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.206, no.1, pp.168 - 177, 2010-10

16

A branch and bound algorithm for locating input and output points of departments on the block layout

Kim, JG; Kim, Yeong-Daeresearcher, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.50, no.5, pp.517 - 525, 1999-05

17

A branch and bound algorithm to minimize total tardiness of jobs in a two identical-parallel-machine scheduling problem with a machine availability constraint

Lee, Ju Yong; Kim, Yeong-Daeresearcher, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.66, no.9, pp.1542 - 1554, 2015-09

18

A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints

Joo, Byung Jun; Kim, Yeong-Daeresearcher, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.60, pp.572 - 582, 2009-04

19

A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness

Lee, GC; Kim, Yeong-Daeresearcher, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.42, pp.4731 - 4743, 2004-11

20

A BRANCH-AND-BOUND APPROACH FOR SPARE UNIT ALLOCATION IN A SERIES SYSTEM

Sung, Chang Supresearcher; LEE, HK, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.75, no.1, pp.217 - 232, 1994-05

Discover

Type

Open Access

Date issued

Subject

. next

rss_1.0 rss_2.0 atom_1.0