Developing scheduling systems for Daewoo Shipbuilding: DAS project

Cited 59 time in webofscience Cited 0 time in scopus
  • Hit : 783
  • Download : 55
Daewoo Shipbuilding Company, one of the largest shipbuilders in the world, had difficulties with planning and scheduling its production process. To solve the problems, Korea Advanced Institute of Science and Technology (KAIST) and Daewoo have been jointly performing the DAS (DAewoo Shipbuilding Scheduling) Project for three years, from 1991 to 1993. To develop the integrated scheduling systems, several technological breakthroughs were necessary such as hierarchical architecture between systems, constraint directed graph search, spatial scheduling, dynamic assembly line scheduling, and neural network based man-hours estimation. Besides these technological research issues, we adopted the phased development strategy, which consists of three phases of vision revelation, data dependent realization, and prospective: enhancement. The DAS systems were successfully launched in January 1994 and are being actively used as indispensable systems in the shipyard resulting in a significant improvement in productivity and reengineering of the scheduling process.
Publisher
ELSEVIER SCIENCE BV
Issue Date
1997-03
Language
English
Article Type
Article
Citation

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.97, no.2, pp.380 - 395

ISSN
0377-2217
URI
http://hdl.handle.net/10203/4358
Appears in Collection
MT-Journal Papers(저널논문)
Files in This Item
This item is cited by other documents in WoS
⊙ Detail Information in WoSⓡ Click to see webofscience_button
⊙ Cited 59 items in WoS Click to see citing articles in records_button

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0