Scheduling of arc welding robot considering heat-caused distortion열변형을 고려한 아크용접 로봇의 스케줄링

Cited 0 time in webofscience Cited 0 time in scopus
  • Hit : 531
  • Download : 0
In this thesis, we focus arc welding robot-scheduling problem considering heat-caused distortion with the objective of minimizing total cycle time. Since this problem is known as a special case of (with additional constraints) traveling salesman problem, it is difficult to solve within a polynomial time. Therefore, we develop a heuristic algorithm for finding the schedule-information in which total cycle time is minimized within a polynomial time. The heuristic is a two-phase method which combines tour construction phase and tour improvement phase. To evaluate its performance, we compare the proposed heuristic with the existing heuristics after modification that is necessary in the problem. Computational results based on randomly generated problems show that the proposed heuristic dominates all those existing heuristics.
Advisors
Kim, Yeong-Daeresearcher김영대researcher
Description
한국과학기술원 : 산업공학과,
Publisher
한국과학기술원
Issue Date
2002
Identifier
173941/325007 / 020003159
Language
eng
Description

학위논문(석사) - 한국과학기술원 : 산업공학과, 2002.2, [ [ii], 37 p. ]

Keywords

Traveling salesman problem; Heat-caused distortion; Arc welding robot scheduling problem; Two-phase heuristic; 2단계 휴리스틱; 외판원 순회; 열변형; 아크 용접 로봇 스케줄링 문제

URI
http://hdl.handle.net/10203/41633
Link
http://library.kaist.ac.kr/search/detail/view.do?bibCtrlNo=173941&flag=dissertation
Appears in Collection
IE-Theses_Master(석사논문)
Files in This Item
There are no files associated with this item.

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0