Concept Selection of NPP Construction Delay Risk Assessment Methodology Using Systems Engineering Approach

Cited 0 time in webofscience Cited 0 time in scopus
  • Hit : 14
  • Download : 0
Construction industry faces a lot of inherent uncertainties and issues and the construction phase of nuclear power project is not free from this risk. This paper investigates promising methodologies to be used on nuclear power plant (NPP) construction schedule delay risk assessment by using entry level systems engineering approach. This study contains how the initial concept for the risk assessment methodology has been developed. In this point of view, this work structured on three main phases: needs analysis (NA), concept exploration (CE), and concept definition (CD) through systems engineering (SE) approach. Traditionally, the SE process is applied to technical development programs but this study opens up a new avenue that SE can also be successfully applied to the development and optimization of the risk assessment model. This study provides a rational and systematic process for developing and selecting the best risk assessment model. This paper selects analytic hierarchy process (AHP) method to assess NPP construction schedule delay risk for international project. As conclusion, the proposed concept and selected method can discriminate successfully and clearly among schedule delay risk assessment methods.
Publisher
The Korean Society of Systems Engineering
Issue Date
2015
Language
English
Article Type
Article
Citation

Journal of the Korea Society of Systems Engineering, v.11, no.1, pp.9 - 24

ISSN
1738-480X
DOI
10.14248/jkosse.2015.11.1.009
URI
http://hdl.handle.net/10203/318446
Appears in Collection
NE-Journal Papers(저널논문)
Files in This Item
There are no files associated with this item.

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0