Short-term demand forecasting for polyvinyl chloride process scheduling폴리염화비닐 제조공정 일정계획을 위한 단기 수요 예측

Cited 0 time in webofscience Cited 0 time in scopus
  • Hit : 765
  • Download : 0
The scheduling of plant should be determined based on the product demands correctly forecasted by reasonable methods. However, because most existing forecasting packages need user’s knowledge about forecasting, it has been hard for plant engineers without forecasting knowledge to apply forecasted demands to scheduling. Therefore, a forecasting module has been developed for plant engineers without forecasting knowledge. In this study, for the development of the forecasting module, an automatic method using the ARIMA model that is framed from modified Box-Jenkins process is proposed. And a new method for safety inventory determination is proposed to reduce the penalty cost by forecasting errors. Finally, using the two proposed methods, the automatic module has been developed.
Advisors
Park, Sun-Wonresearcher박선원researcher
Description
한국과학기술원 : 생명화학공학과,
Publisher
한국과학기술원
Issue Date
2004
Identifier
240407/325007  / 020023903
Language
eng
Description

학위논문(석사) - 한국과학기술원 : 생명화학공학과, 2004.8, [ vi, 61 p. ]

Keywords

POLYVINYL CHLORIDE; PVC; DEMAND FORECASTING; SCHEDULING; 안전제고; 생산계획; 폴리염화비닐; 수요 예측; SAFETY INVENTORY

URI
http://hdl.handle.net/10203/29841
Link
http://library.kaist.ac.kr/search/detail/view.do?bibCtrlNo=240407&flag=dissertation
Appears in Collection
CBE-Theses_Master(석사논문)
Files in This Item
There are no files associated with this item.

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0