A Supercritical CO2 Waste Heat Recovery System Design for a Diesel Generator for Nuclear Power Plant Application

Cited 4 time in webofscience Cited 4 time in scopus
  • Hit : 455
  • Download : 355
DC FieldValueLanguage
dc.contributor.authorHam, Jin Kiko
dc.contributor.authorKim, Min Seokko
dc.contributor.authorOh, Bong Seongko
dc.contributor.authorSon, Seongminko
dc.contributor.authorLee, Jekyoungko
dc.contributor.authorLee, Jeong-Ikko
dc.date.accessioned2020-01-31T08:20:07Z-
dc.date.available2020-01-31T08:20:07Z-
dc.date.created2019-12-30-
dc.date.created2019-12-30-
dc.date.created2019-12-30-
dc.date.issued2019-12-
dc.identifier.citationAPPLIED SCIENCES-BASEL, v.9, no.24-
dc.identifier.issn2076-3417-
dc.identifier.urihttp://hdl.handle.net/10203/271982-
dc.description.abstractAfter the Fukushima accident, the importance of an emergency power supply for a nuclear power plant has been emphasized more. In order to maximize the performance of the existing emergency power source in operating nuclear power plants, adding a waste heat recovery system for the emergency power source is suggested for the first time in this study. In order to explore the possibility of the idea, a comparison of six supercritical carbon dioxide (S-CO2) power cycle layouts recovering waste heat from a 7.2 MW alternate alternating current diesel generator (AAC DG) is first presented. The diesel engine can supply two heat sources to the waste heat recovery system: one from exhaust gas and the other from scavenged air. Moreover, a sensitivity study of the cycles for different design parameters is performed, and the thermodynamic performances of the various cycles were evaluated. The main components, including turbomachinery and heat exchangers, are designed with in-house codes which have been validated with experiment data. Based on the designed cycle and components, the bottoming S-CO2 cycle performance under part load operating condition of AAC DG is analyzed by using a quasi-steady state cycle analysis method. It was found that a partial heating cycle has relatively higher net produced work while enjoying the benefit of a simple layout and smaller number of components. This study also revealed that further waste heat can be recovered by adjusting the flow split merging point of the partial heating cycle.-
dc.languageEnglish-
dc.publisherMDPI-
dc.titleA Supercritical CO2 Waste Heat Recovery System Design for a Diesel Generator for Nuclear Power Plant Application-
dc.typeArticle-
dc.identifier.wosid000518042000117-
dc.identifier.scopusid2-s2.0-85077369164-
dc.type.rimsART-
dc.citation.volume9-
dc.citation.issue24-
dc.citation.publicationnameAPPLIED SCIENCES-BASEL-
dc.identifier.doi10.3390/app9245382-
dc.contributor.localauthorLee, Jeong-Ik-
dc.contributor.nonIdAuthorKim, Min Seok-
dc.contributor.nonIdAuthorLee, Jekyoung-
dc.description.isOpenAccessY-
dc.type.journalArticleArticle-
dc.subject.keywordAuthoremergency diesel generator-
dc.subject.keywordAuthorsupercritical carbon dioxide cycle-
dc.subject.keywordAuthorwaste heat recovery system-
dc.subject.keywordAuthorbottoming cycle-
dc.subject.keywordPlusWATER-COOLED SMALL-
dc.subject.keywordPlusBRAYTON CYCLE-
dc.subject.keywordPlusPERFORMANCE-
This item is cited by other documents in WoS
⊙ Detail Information in WoSⓡ Click to see webofscience_button
⊙ Cited 4 items in WoS Click to see citing articles in records_button

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0