Waiting time optimization in queueing models of equipment with multiple preventive maintenance cycles복수 예방 정비를 고려한 대기행렬 모델의 체재 시간 최적화

Cited 0 time in webofscience Cited 0 time in scopus
  • Hit : 772
  • Download : 0
Preventive maintenance activities perform important part in preventing unexpected failure and ensuring the reliability of the equipment. In the semiconductor manufacturing, preventive maintenance include many and complex tasks. According to the planning of PM, the cycle time and line performance are affected. In this paper a model is proposed that optimizes the new cycle of single PM and multiple PMs for minimizing cycle time with consideration of attached setups. This model consists of two parts. First, part is the queueing networks with sin-gle PM. Second part is the queueing networks with multiple PMs. The queueing networks are applied in the M/G/1-queue and G/G/m queue. The model is formulated as nonlinear programming problem with constraints. In order to solve this model, The matlab optimization toolbox is used. Since the model of G/G/m queue is ap-proximation, The optimal solution is not guaranteed. Thus, the results obtained have compared with a simulation model is made into the Arena 14.5 version and Opt quest.
Advisors
James Robert Morrisonresearcher제임스모리슨
Description
한국과학기술원 : 산업및시스템공학과,
Publisher
한국과학기술원
Issue Date
2014
Identifier
568911/325007  / 020123187
Language
eng
Description

학위논문(석사) - 한국과학기술원 : 산업및시스템공학과, 2014.2, [ ii, 48 p. ]

Keywords

nonlinear programming; Planning; Preventive maintenance; optimize; G/G/m; M/G/1; 최적화; 예방정비; queueing networks; cycle time

URI
http://hdl.handle.net/10203/198093
Link
http://library.kaist.ac.kr/search/detail/view.do?bibCtrlNo=568911&flag=dissertation
Appears in Collection
IE-Theses_Master(석사논문)
Files in This Item
There are no files associated with this item.

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0