3981 | Tool replacement policies for a machining centre producing multiple types of products with distinct due dates Choi, Yong-Chan; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.39, no.5, pp.907 - 921, 2001-03 |
3982 | Generating interpretable fuzzy rules for adaptive job dispatching Lee, KK; Yoon, Wan Chul; Baek, DH, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.39, no.5, pp.1011 - 1030, 2001-03 |
3983 | Design of a carousel system based on a recursive opitmization/simulation procedure Hwang, Hark, The Institute for Operations Research and the Management Science, INFORMS, 2001-01-01 |
3984 | Routing policies in an order picking operation Hwang, Hark, , 2001-01-01 |
3985 | Fault-tolerant routing in the optical multistage interconnection network KyungSoo Park, 2001 Int. Maintenance Eng. Conf., 2001-01-01 |
3986 | A static model for purchasing, remanufacturing & waste disposal Hwang, Hark, , 2001-01-01 |
3987 | B2B Pilot Project for the Die/Mold Industry in Korea Choi, Byoung Kyu, , 2001-01-01 |
3988 | Performance-related Reliability for Fault-tolerant Multistage Interconnection Networks KyungSoo Park, Proc. Kor. Soc. Maintenance Eng., pp.11 - 16, 2001-01-01 |
3989 | A dispatching algorithm for multiple-load AGVS using a fuzzy decision-making method in a job shop environment Kim, DB; Hwang, Hark, ENGINEERING OPTIMIZATION, v.33, no.5, pp.523 - 547, 2001-01 |
3990 | A recursive optimization/simulation procedure for designing shuttle parking system Hwang, Hark; Lee, Suk, ASIA PACIFIC MANAGEMENT REVIEW, v.6, no.2, pp.253 - 264, 2001-01 |
3991 | Inventory ratio based production switching heuristic(RPSH) for the aggregate production planning problem Cha, Chun Nam; Hwang, Hark, ASIA PACIFIC MANAGEMENT REVIEW, v.6, no.1, pp.1 - 16, 2001-01 |
3992 | Routing in the Optical Multistage Interconnection Network with Crosstalk Faults Park, Kyung-Soo, J. KOR. SOC. MAINTENANCE ENG., v.6, no.2, pp.249 - 260, 2001-01 |
3993 | Analysis of difference fairing based on DFT-filter Cho, SK; Choi, Byoung Kyu, COMPUTER-AIDED DESIGN, v.33, no.1, pp.45 - 56, 2001-01 |
3994 | Scheduling problem in a two-machine flow line with the N- step prio-fob-dependent set-up times Hwang, Hark, INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, v.32, no.3, pp.375 - 385, 2001-01 |
3995 | TPM - Total Productive Maintenance: Impact on Competitiveness and a Framework for Successful Implementation Park, Kyung Soo, HUMAN FACTORS AND ERGONOMICS IN MANUFACTURING & SERVICE INDUSTRIES, v.11, no.4, pp.321 - 338, 2001-01 |
3996 | Design of Reliability Acceptance Sampling Plans Based on Accelerated Degradation Tests Yum, Bong-Jin; Park, Jong-In, ASIA PACIFIC MANAGEMENT REVIEW, v.6, no.4, pp.461 - 476, 2001-01 |
3997 | Structured information analysis for human reliability analysis of emergency tasks in nuclear power plants Jung, WD; Yoon, Wan Chul; Kim, JW, RELIABILITY ENGINEERING SYSTEM SAFETY, v.71, no.1, pp.21 - 32, 2001-01 |
3998 | Design of Information Content and Layout for Process Control Based on Goal-Means Domain Analysis Ham, D.H.; Yoon, Wan Chul, COGNITION, TECHNOLOGY, AND WORK, v.3, no.4, pp.205 - 223, 2001-01 |
3999 | A Simple Vision-Based Head Tracking Method for Eye-Ccontrolled Human/Computer Interface Park, Kyung Soo, INT. J. OF HUMAN-COMPUTER STUDIES, v.54, no.0, pp.319 - 332, 2001-01 |
4000 | Drivers' Characteristics in the Perception of a Lead Vehicle's Deceleration Level Park, Kyung Soo, IEA JOURNAL OF ERGONOMICS RESEARCH, v.5, no.2, pp.125 - 136, 2001-01 |