공간 일정 계획의 이슈들과 접근 방법

Cited 0 time in webofscience Cited 0 time in scopus
  • Hit : 487
  • Download : 0
In large-scale industry such as shipbuilding, aircraft manufacturing, and construction industry etc., it is required to consider two or three-dimensional spatial availability as one of bottlenecked resource constraints. We call this kind of scheduling a spatial scheduling, which considers the dynamic spatial layouts of objects as well as the traditional resource constraints. Since 1991, we have researched on the spatial scheduling for shipbuilding plant (Lee & Lee, 1992; Lee et al., 1994, Lee et al., 1995). In this paper, we present the various issues of spatial scheduling for the researchers and developers attacking spatial scheduling problems.
Issue Date
1995-01
Language
KOR
Citation

한국경영과학회/대한산업공학회 '95 춘계공동학술대회 논문집, v.1, no.2, pp.758 - 759

URI
http://hdl.handle.net/10203/124962
Appears in Collection
MT-Conference Papers(학술회의논문)
Files in This Item
There are no files associated with this item.

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0