DC Field | Value | Language |
---|---|---|
dc.contributor.author | Hwang, H. C. | ko |
dc.contributor.author | Choi, Byoung Kyu | ko |
dc.date.accessioned | 2009-09-04T06:42:55Z | - |
dc.date.available | 2009-09-04T06:42:55Z | - |
dc.date.created | 2012-02-06 | - |
dc.date.created | 2012-02-06 | - |
dc.date.issued | 2007 | - |
dc.identifier.citation | INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, v.20, no.6, pp.557 - 566 | - |
dc.identifier.issn | 0951-192X | - |
dc.identifier.uri | http://hdl.handle.net/10203/10999 | - |
dc.description.abstract | In a job shop such as a mould-making shop, dispatching decisions as to which job should be loaded on a machine when it becomes free are termed dynamic scheduling. A practical approach to dynamic job-shop scheduling is the use of discrete event simulation, and their dedicated simulation-based dynamic scheduling systems, often known as manufacturing execution systems or advanced planning systems, are available. In the present paper, we propose a workflow-based dynamic scheduling framework, in which a workflow management system (WfMS) serves as a dynamic job-shop scheduler. For this purpose, we have developed an algorithm for embedding a discrete-event simulation mechanism into a WfMS, and have implemented a prototype job-shop scheduler. Illustrative performance evaluation shows that the proposed framework is logically valid and computationally efficient. | - |
dc.description.sponsorship | This work was supported in part by grant No.R01-2006- 000-11118-0 from the Basic Research Program of the Korea Science & Engineering Foundation. | en |
dc.language | English | - |
dc.language.iso | en_US | en |
dc.publisher | TAYLOR FRANCIS LTD | - |
dc.subject | SIMULATION | - |
dc.subject | SYSTEM | - |
dc.subject | ARCHITECTURE | - |
dc.subject | ALGORITHMS | - |
dc.title | Workflow-based dynamic scheduling of job shop operations | - |
dc.type | Article | - |
dc.identifier.wosid | 000248334000005 | - |
dc.identifier.scopusid | 2-s2.0-34547529439 | - |
dc.type.rims | ART | - |
dc.citation.volume | 20 | - |
dc.citation.issue | 6 | - |
dc.citation.beginningpage | 557 | - |
dc.citation.endingpage | 566 | - |
dc.citation.publicationname | INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING | - |
dc.identifier.doi | 10.1080/09511920601024179 | - |
dc.embargo.liftdate | 9999-12-31 | - |
dc.embargo.terms | 9999-12-31 | - |
dc.contributor.localauthor | Choi, Byoung Kyu | - |
dc.contributor.nonIdAuthor | Hwang, H. C. | - |
dc.type.journalArticle | Article | - |
dc.subject.keywordAuthor | workflow simulation | - |
dc.subject.keywordAuthor | dynamic scheduling | - |
dc.subject.keywordAuthor | job shop scheduling | - |
dc.subject.keywordAuthor | enactment service | - |
dc.subject.keywordAuthor | WfMS | - |
dc.subject.keywordAuthor | BPMS | - |
dc.subject.keywordPlus | SIMULATION | - |
dc.subject.keywordPlus | SYSTEM | - |
dc.subject.keywordPlus | ARCHITECTURE | - |
dc.subject.keywordPlus | ALGORITHMS | - |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.