DC Field | Value | Language |
---|---|---|
dc.contributor.author | Lee, Ho-Yeoul | ko |
dc.contributor.author | Choi, Byoung-Kyu | ko |
dc.date.accessioned | 2013-03-12T10:43:57Z | - |
dc.date.available | 2013-03-12T10:43:57Z | - |
dc.date.created | 2012-07-08 | - |
dc.date.created | 2012-07-08 | - |
dc.date.issued | 2011-02 | - |
dc.identifier.citation | INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, v.24, no.2, pp.171 - 187 | - |
dc.identifier.issn | 0951-192X | - |
dc.identifier.uri | http://hdl.handle.net/10203/102060 | - |
dc.description.abstract | Recent information systems are evolving and starting to have reconfigurable structures that enable rapid implementation and maintenance. Simulation-based planning and scheduling approaches are considered to be suitable for this trend, because they utilise simulations as decision-support tools composed of simulator, simulation models and experimental frames, and these components can be modularised easily according to their functionalities. To implement a simulation-based planning and scheduling system, we have designed workflows for basic structures of the system and a workflow management system that can be used as a platform on which various Web services and Business rules can be integrated. We have described the technical requirements and presented how to resolve them. As a case study, a production planning system is developed in the workflow-based manner along with the classical method as a control group; we have done a comparative performance evaluation between the two methodologies. This case study demonstrates that the proposed workflow-based approach is able to minimise system development efforts and maintain high enough performance to apply the approach in real life. | - |
dc.language | English | - |
dc.publisher | TAYLOR FRANCIS LTD | - |
dc.subject | ARCHITECTURE | - |
dc.subject | MANAGEMENT | - |
dc.subject | MODEL | - |
dc.subject | EXCHANGE | - |
dc.title | Using workflow for reconfigurable simulation-based planning and scheduling system | - |
dc.type | Article | - |
dc.identifier.wosid | 000286660400006 | - |
dc.identifier.scopusid | 2-s2.0-78751486499 | - |
dc.type.rims | ART | - |
dc.citation.volume | 24 | - |
dc.citation.issue | 2 | - |
dc.citation.beginningpage | 171 | - |
dc.citation.endingpage | 187 | - |
dc.citation.publicationname | INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING | - |
dc.identifier.doi | 10.1080/0951192X.2010.542180 | - |
dc.embargo.liftdate | 9999-12-31 | - |
dc.embargo.terms | 9999-12-31 | - |
dc.contributor.localauthor | Choi, Byoung-Kyu | - |
dc.type.journalArticle | Article | - |
dc.subject.keywordAuthor | workflow management system (WfMS) | - |
dc.subject.keywordAuthor | simulation-based planning and scheduling | - |
dc.subject.keywordAuthor | simulation | - |
dc.subject.keywordAuthor | manufacturing information systems | - |
dc.subject.keywordPlus | ARCHITECTURE | - |
dc.subject.keywordPlus | MANAGEMENT | - |
dc.subject.keywordPlus | MODEL | - |
dc.subject.keywordPlus | EXCHANGE | - |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.