Browse by Type Article

Showing results 52741 to 52760 of 99750

52741
Minimizing Leakage Power of Sequential Circuits through Mixed-V-t Flip-Flops and Multi-V-t Combinational Gates

Kim, Jaehyun; Oh, Chungki; Shin, Youngsoo, ACM TRANSACTIONS ON DESIGN AUTOMATION OF ELECTRONIC SYSTEMS, v.15, no.1, 2009-12

52742
Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times

An, Young-Jin; Kim, Yeong-Dae; Choi, Seong-Woo, COMPUTERS & OPERATIONS RESEARCH, v.71, pp.127 - 136, 2016-07

52743
Minimizing Makespan in a Two-Machine Flowshop with Dynamic Arrivals Allowed

Sung, Chang Sup; Kim, YH, COMPUTERS AND OPERATIONS RESEARCH, v.29, no.3, pp.275 - 294, 2002-02

52744
Minimizing Makespan on a Single Burn-in Oven in Semiconductor Manufacturing

Sung, Chang Sup, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.120, no.3, pp.559 - 574, 2000-02

52745
Minimizing Makespan on a Single Burn-In Oven wih Job Families and Dynamic Job Arrivals Allowed

Sung, Chang Sup, COMPUTERS & OPERATIONS RESEARCH, v.120, no.3, pp.559 - 574, 2000-10

52746
Minimizing makespan on a two-machine re-entrant flowshop

Choi, SW; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.58, pp.972 - 981, 2007-07

52747
Minimizing makespan on an m-machine re-entrant flowshop

Choi, Seong-Woo; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.35, no.5, pp.1684 - 1696, 2008-05

52748
Minimizing maximum completion time in a two-batch-processing-machine flowshop with dynamic arrivals allowed

Sung, Chang Sup; Yoon, SH, ENGINEERING OPTIMIZATION, v.28, no.3, pp.231 - 243, 1997-04

52749
MINIMIZING MEAN TARDINESS AND EARLINESS IN SINGLE-MACHINE SCHEDULING PROBLEMS WITH UNEQUAL DUE-DATES

Kim, Yeong-Dae; YANO, CA, NAVAL RESEARCH LOGISTICS, v.41, no.7, pp.913 - 933, 1994-12

52750
Minimizing protection switching time in transport networks with shared mesh protection

Cho, Choong-hee; Ryoo, Jeong-dong, INTERNATIONAL JOURNAL OF NETWORK MANAGEMENT, v.31, no.4, 2021-07

52751
Minimizing the fluorescence quenching caused by uncontrolled aggregation of CdSe/CdS core/shell quantum dots for biosensor applications

Kang, Taegyeong; Um, Kiju; Park, Jinmo; Chang, Hochan; Lee, DohChang; Kim, Chang-Koo; Lee, Kangtaek, SENSORS AND ACTUATORS B-CHEMICAL, v.222, pp.871 - 878, 2016-01

52752
Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance

Lee, Ju-Yong; Kim, Yeong-Dae, COMPUTERS OPERATIONS RESEARCH, v.39, no.9, pp.2196 - 2205, 2012-09

52753
Minimizing the Two-Round Even-Mansour Cipher

Chen, Shan; Lampe, Rodolphe; Lee, Jooyoung; Seurin, Yannick; Steinberger, John, JOURNAL OF CRYPTOLOGY, v.31, no.4, pp.1064 - 1119, 2018-10

52754
Minimizing tool changeovers in three parallel and identical CNC machining centres

Kumar K.D.; Khan B.K., JOURNAL OF ADVANCED MANUFACTURING SYSTEMS, v.3, no.2, pp.169 - 181, 2004

52755
Minimizing total tardiness in a two-machine flowshop scheduling problem with availability constraint on the first machine

Lee, Ju-Yong; Kim, Yeong-Dae, COMPUTERS & INDUSTRIAL ENGINEERING, v.114, pp.22 - 30, 2017-12

52756
Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times

Jeong, Bong Joo; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.47, pp.72 - 80, 2014-07

52757
Minimizing total tardiness in an unrelated parallel-machine scheduling problem

Shim, SO; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.58, pp.346 - 354, 2007-03

52758
MINIMIZING TOTAL TARDINESS IN PERMUTATION FLOWSHOPS

Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.85, no.3, pp.541 - 555, 1995-09

52759
Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop

Choi, SW; Kim, Yeong-Dae; Lee, GC, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.43, pp.2149 - 2167, 2005-06

52760
Minimizing total tardiness on a two-machine re-entrant flowshop

Choi, Seong-Woo; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.199, no.2, pp.375 - 384, 2009-12

rss_1.0 rss_2.0 atom_1.0