Browse by Title 

Showing results 174941 to 174960 of 279418

174941
Scheduling of Batch Manufacturing Process in The Chemical Plants with An Optimal Control Approach

Park, Sunwon, The 12th Symposium on Chemical Engineering, pp.175 - 176, 1999-01-01

174942
Scheduling of Cluster Tools with Complex Scheduling Requirements

Yu, Tae Sun; Lee, Tae-Eog, 20th Conference of the International Federation of Operational Research Societies, IFORS, 2014-07-15

174943
Scheduling of cluster tools with independent dual-arm under wafer delay constraints = 체재시간 제약을 가지는 독립된 두 팔 클러스터 장비의 스케줄링link

Kwon, Yongmin; Lee, Tae-Eog; et al, 한국과학기술원, 2017

174944
Scheduling of cluster tools with k-periodic chamber cleaning operationslink

Lee, Tae-Gyung; Lee, Tae-Eog; et al, 2021

174945
Scheduling of cluster tools with ready time constraints for small lot production

Lee, Tae-Eog; Kim, Hyun-Jung, IEEE 2011 International Conference on Automation Science and Engineering, pp.96 - 101, IEEE, 2011-08-25

174946
Scheduling of dual independent armed cluster tool with unbalanced workload = 독립적인 두팔을 가진 클러스터 장비의 불균형한 워크로드 스케쥴링link

Sheen, Dong Yup; 신동엽; et al, 한국과학기술원, 2015

174947
Scheduling of Dual-armed Cluster Tools with 2-cyclic Chamber Cleaning Operations

이태경; 이태억, 2018춘계공동학술대회, 대한산업공학회, 2018-04-05

174948
Scheduling of Dual-armed Cluster Tools with k-periodic Chamber Cleaning

LEE, TAE GYUNG; Lee, Tae-Eog, 2018 대한산업공학회 추계학술대회, pp.747 - 777, 대한산업공학회, 2018-11-09

174949
Scheduling of Dual-Armed Cluster Tools with Time Constraints

Kim, Ja-Hee; Lee, Tae-Eog; Lee, Hwan-Yong, MASM, pp.1 - 6, 2002-04

174950
Scheduling of Dual-Gripper Robotic Cells With Reinforcement Learning

Kim, Hyun-Jung; Lee, Jun-Ho, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.19, no.2, pp.1120 - 1136, 2022-04

174951
Scheduling of flexible manufacturing systems employing automated guided vehicles

Lee, Doo Yong, International Conference on CAD/CAM Robotics and Factories of the Future, pp.139 - 144, 1993-08

174952
Scheduling of manufacturing systems with reentrant work flows and sequence dependent setup times = 작업 순서에 종속적인 세트업시간 및 재진입 작업 흐름을 갖는 제조시스템의 스케쥴링link

Sun, Ji-Ung; 선지웅; et al, 한국과학기술원, 1999

174953
Scheduling of multi-level parts in a flexible manufacturing system = 유연 제조 시스템에서 다단계 부품의 일정 계획에 관한 연구link

Kim, Jung-Ug; 김정욱; et al, 한국과학기술원, 1994

174954
Scheduling of multi-slot cluster tools with wafer delay constraintslink

Jee, Young-Jun; Lee, Tae-Eog; et al, 2021

174955
Scheduling of multimedia traffic for continuous media in packet-switched networks

Khil, Ara; Maeng, SeungRyoul, Multimedia Computing and Networking, SPIE, pp.29 - 40, International Society for Optical Engineering (SPIE), 1997-01

174956
Scheduling of parallel machines to minimize total completion time subject to s-precedence constraints

Kim, Eun-Seok; Sung, Chang Sup; Lee, Ik-Sun, COMPUTERS & OPERATIONS RESEARCH, v.36, no.3, pp.698 - 710, 2009

174957
Scheduling of periodically-arriving task batches = 동적 수요를 위한 선행관계에 있는 과제집단의 일정계획link

Yoon, Sang-Hum; 윤상흠; et al, 한국과학기술원, 1992

174958
Scheduling of Petri nets as a multi-objective shortest path problem

Wikborg, Uno; Lee, Tae-Eog, IEEE Conference on Automation Science and Engineering, IEEE, 2012-08-22

174959
Scheduling of Primary Steelmaking Processes with an Optimal Control Approach

Park, Sunwon, KIChE Spring Meeting, KIChE, 2000-01-01

174960
Scheduling of Primary Steelmaking Processes: Part 1. Mathematical Modeling

Park, Sunwon, KIChE Spring Meeting, KIChE, 2000-01-01

rss_1.0 rss_2.0 atom_1.0