172401 | Scheduling of Three-Operation Jobs in a Two-Machine Flow Shop with Mean Flow Time Measure 성창섭, 한국경영과학회, 2006 |
172402 | Scheduling of three-operation jobs in a two-machine flowshop with mean flowtime measure = 두 대의 기계에서 세 가지씩의 공정을 수행하는 작업의 평균 플로우 시간을 최소화하는 스케쥴링 문제link Ha, Hee-Jin; 하희진; et al, 한국과학기술원, 2007 |
172403 | Scheduling of Value-Recoverable Jobs for Maximizing Total Job Value over a Planning Horizon = Job의 가치 회복 최적화를 위한 일정계획 연구link Kim, Sung-Hoon; 김성훈; et al, 한국과학기술원, 2009 |
172404 | Scheduling of vessel transportation and sales distribution for exporting refinery products = 정유제품수출을 위한 운송 및 판매 스케줄링link Bai, Chunmei; 백춘매,; et al, 한국과학기술원, 2009 |
172405 | Scheduling on parallel identical machines to minimize total tardiness Shim, SO; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.177, pp.135 - 146, 2007-02 |
172406 | Scheduling Parallel Tasks with Individual Deadlines Chwa, Kyung Yong, Lecture Notes in Computer Science, Algorithms and Computation - 3rd Interantional symposium, ISAAC 1995, Proc., pp.198 - 207, 1995 |
172407 | Scheduling Parallel Tasks with Individual Deadlines Chwa, Kyung Yong, THEORETICAL COMPUTER SCIENCE, v.215, no.1, pp.209 - 223, 1999-01 |
172408 | Scheduling PID Attitude and Position Control Frequencies for Time-Optimal Quadrotor Waypoint Tracking under Unknown External Disturbances Kang, Cheongwoong; Park, Bumjin; Choi, Jaesik, SENSORS, v.22, no.1, 2022-01 |
172409 | Scheduling pressing processes of battery manufacturing with a genetic algorithm Park, Sang-Su; Lee, Sangwook; Kim, Hyunjung, IEEE International Conference on Automation Science and Engineering, IEEE Robotics and Automation Society, 2020-08-21 |
172410 | Scheduling problem for persistent automated robotic service = 지속적인 자동 로봇 서비스를 위한 스케쥴링 문제link Song, Byung Duk; 송병덕; et al, 한국과학기술원, 2015 |
172411 | Scheduling problem in a two-machine flow line with the N- step prio-fob-dependent set-up times Hwang, Hark, INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, v.32, no.3, pp.375 - 385, 2001-01 |
172412 | Scheduling problems related with due date measures in parallel-machine shops = 병렬 기계 공정에서의 납기를 고려한 일정계획에 관한 연구link Shim, Sang-Oh; 심상오; et al, 한국과학기술원, 2006 |
172413 | Scheduling problems with due date-related measures for hybrid flowshops = 혼합 흐름 공정에서의 납기를 고려한 일정계획에 관한 연구link Lee, Geun-Cheol; 이근철; et al, 한국과학기술원, 2003 |
172414 | Scheduling proxy: Enabling adaptive-grained scheduling for global computing system Han J.; Park D., Proceedings - Fifth IEEE/ACM International Workshop on Grid Computing, pp.415 - 420, 2004-11-08 |
172415 | Scheduling proxy: Enabling adaptive-grained scheduling for global computing system Han, Jaesun; Park, Daeyeon, IEICE TRANSACTIONS ON COMMUNICATIONS, v.E88B, no.4, pp.1448 - 1457, 2005-04 |
172416 | Scheduling Reusable Instructions for Power Reduction Hu, J.S.; Vijaykrishnan, N.; Kim, Soontae; Kandemir, M.; Irwin, M.J., Proceedings Design, Automation and Test in Europe Conference and Exhibition, 2004. , v.1, pp.148 - 153, 2004-02 |
172417 | Scheduling Scheme for QoS guided Grid Service Han, Y; Kim, B; Youn, ChanHyun, Triangle Symposium on Advanced ICT2010(TriSAI2010), Triangle Symposium on Advanced ICT2010(TriSAI2010), 2010-10-25 |
172418 | Scheduling schemes for throughput maximization and fairness in OFDMA systemslink Tien-Dzung Nguyen; Han, Young-Nam; et al, 한국정보통신대학교, 2006 |
172419 | Scheduling self-similar traffic in packet-switching systems with high utilisation Kim, MH; Park, Hong-Shik, IEE PROCEEDINGS-COMMUNICATIONS, v.151, pp.429 - 437, 2004-10 |
172420 | Scheduling Shipbuilding using Constraint Directed Graph Search: DAS-ERECT Lee, Jae Kyu; Choi, Hyung Rim; Yang, Ok Ryul; Kim, Ho Dong, INTERNATIONAL SYSTEMS IN ACCOUNTING FINANCE AND MANAGEMENT, v.3, no.2, pp.111 - 125, 1994 |