Showing results 131521 to 131540 of 279406
Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance Lee, Ju-Yong; Kim, Yeong-Dae, COMPUTERS OPERATIONS RESEARCH, v.39, no.9, pp.2196 - 2205, 2012-09 |
Minimizing the Size of Bins in Multiple Grid Histograms Using Tree-based Index 김재호; 김명호, 2014 KIISE Winter Conference, pp.249 - 251, The Korean Institute of Information Scientists and Engineers, 2014-12-19 |
Minimizing the two-round Even-Mansour cipher Chen, Shan; Lampe, Rodolphe; Lee, Jooyoung; Seurin, Yannick; Steinberger, John, 34rd Annual International Cryptology Conference, CRYPTO 2014, pp.39 - 56, International Association for Cryptologic Research (IACR), 2014-08-17 |
Minimizing the Two-Round Even-Mansour Cipher Chen, Shan; Lampe, Rodolphe; Lee, Jooyoung; Seurin, Yannick; Steinberger, John, JOURNAL OF CRYPTOLOGY, v.31, no.4, pp.1064 - 1119, 2018-10 |
Minimizing tool changeovers in three parallel and identical CNC machining centres Kumar K.D.; Khan B.K., JOURNAL OF ADVANCED MANUFACTURING SYSTEMS, v.3, no.2, pp.169 - 181, 2004 |
Minimizing tool costs subject to a makespan constraint in a flexible manufacturing system Lim, Seung-Kil; Lee, Geun-Cheol; Choi, Seong-Kook; Kim, Yeong-Dae, Asia-Pacific Conference on Industrial Engineering and Management Systems, pp.243 - 246, 1999 |
Minimizing total tardiness in a single machine scheduling problem with periodically scheduled maintenance = 정기적인 정비 계획이 있는 단일 기계 공정에서의 납기지연 최소화를 위한 연구link Du, Nguyen Van; Du, N. V.; et al, 한국과학기술원, 2009 |
Minimizing total tardiness in a two parallel batch-and-single machines system with incompatible job families = 두 대로 구성된 병렬 (뱃치, 단독) 시스템에서 Incompatible job 패밀리에 대한 total tardiness 대상의 스케줄링 연구link Tang, Chonglin; 당숭린; Tang, C. Lin; et al, 한국과학기술원, 2006 |
Minimizing total tardiness in a two-machine flowshop scheduling problem with availability constraint on the first machine Lee, Ju-Yong; Kim, Yeong-Dae, COMPUTERS & INDUSTRIAL ENGINEERING, v.114, pp.22 - 30, 2017-12 |
Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times Jeong, Bong Joo; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.47, pp.72 - 80, 2014-07 |
Minimizing total tardiness in an unrelated parallel-machine scheduling problem Shim, Sang-Oh; Kim, Yeong-Dae, Asia-Pacific Management Conference, pp.979 - 990, 2004 |
Minimizing total tardiness in an unrelated parallel-machine scheduling problem Shim, SO; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.58, pp.346 - 354, 2007-03 |
MINIMIZING TOTAL TARDINESS IN PERMUTATION FLOWSHOPS Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.85, no.3, pp.541 - 555, 1995-09 |
Minimizing total tardiness of jobs on batch processing machines with incompatible job families = 제품군별 구성 제약이 있는 배치 작업 병렬 시스템에서 납기를 고려한 일정 계획에 관한 연구link Choi, So-Young; 최소영; et al, 한국과학기술원, 2004 |
Minimizing total tardiness of orders with re-entrant lots on a hybrid flowshop = 재투입이 있는 혼합 흐름 공정에서 주문의 총 납기 지연을 최소화하는 스케쥴링 방법 개발link Choi, Seong-Woo; 최성우; et al, 한국과학기술원, 2003 |
Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop Choi, SW; Kim, Yeong-Dae; Lee, GC, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.43, pp.2149 - 2167, 2005-06 |
Minimizing total tardiness on a two-machine re-entrant flowshop Choi, Seong-Woo; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.199, no.2, pp.375 - 384, 2009-12 |
MINIMIZING TOTAL TARDINESS ON PARALLEL MACHINES SUBJECT TO FLEXIBLE MAINTENANCE Lee, Ju-Yong; Kim, Yeong-Dae; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, v.25, no.4, pp.472 - 489, 2018-12 |
Minimizing total tardiness on parallel machines with job splitting property = 작업 분할이 있는 병렬 기계에서의 납기를 고려한 스케줄링 문제에 관한 연구link Kim, Soo-Bin; 김수빈; et al, 한국과학기술원, 2002 |
Minimizing Total Weighted Completion Time at a Pre-assembly Stage Composed of Tow Feeding Machines Sung, Chang Sup, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.54, no.3, pp.247 - 255, 1998-04 |
Discover