Browse by Subject STEADY-STATE THROUGHPUT

Showing results 1 to 11 of 11

1
An Efficient Mixed Integer Programming Model Based on Timed Petri Nets for Diverse Complex Cluster Tool Scheduling Problems

Jung, Chihyun; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.25, no.2, pp.186 - 199, 2012-05

2
Cyclic Scheduling of Cluster Tools With Nonidentical Chamber Access Times Between Parallel Chambers

Kim, Dae-Kyu; Jung, Yu-Ju; Jung, Chi-Hyun; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.25, no.3, pp.420 - 431, 2012-08

3
Optimal scheduling for sequentially connected cluster tools with dual-armed robots and a single input and output module

Kim, Dae-Kyu; Kim, Hyunjung; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.55, no.11, pp.3092 - 3109, 2017-07

4
Scheduling Cluster Tools for Concurrent Processing of Two Wafer Types

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.11, no.2, pp.525 - 536, 2014-04

5
Scheduling cluster tools for concurrent processing of two wafer types with PM sharing

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.53, no.19, pp.6007 - 6022, 2015-10

6
Scheduling Cluster Tools With Ready Time Constraints for Consecutive Small Lots

Kim, Hyun-Jung; Lee, Jun-Ho; Jung, Chi-Hyun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.10, no.1, pp.145 - 159, 2013-01

7
Scheduling Dual-Armed Cluster Tools for Concurrent Processing of Multiple Wafer Types With Identical Job Flows

Ko, Sung-Gil; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.16, no.3, pp.1058 - 1070, 2019-07

8
Scheduling dual-armed cluster tools with cleaning processes

Kim, Hee-Jung; Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.51, no.12, pp.3671 - 3687, 2013-06

9
Scheduling In-Line Multiple Cluster Tools

Kim, Hyunjung; Lee, Jun-Ho; Baik, Sunhee; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.28, no.2, pp.171 - 179, 2015-05

10
Scheduling Lot Switching Operations for Cluster Tools

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.26, no.4, pp.592 - 601, 2013-11

11
Scheduling Single-Armed Cluster Tools With Chamber Cleaning Operations

Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.15, no.2, pp.705 - 716, 2018-04

rss_1.0 rss_2.0 atom_1.0