Showing results 73741 to 73760 of 109418
Scheduling of Dual-armed Cluster Tools with 2-cyclic Chamber Cleaning Operations 이태경; 이태억, 2018춘계공동학술대회, 대한산업공학회, 2018-04-05 |
Scheduling of Dual-armed Cluster Tools with k-periodic Chamber Cleaning LEE, TAE GYUNG; Lee, Tae-Eog, 2018 대한산업공학회 추계학술대회, pp.747 - 777, 대한산업공학회, 2018-11-09 |
Scheduling of Dual-Armed Cluster Tools with Time Constraints Kim, Ja-Hee; Lee, Tae-Eog; Lee, Hwan-Yong, MASM, pp.1 - 6, 2002-04 |
Scheduling of flexible manufacturing systems employing automated guided vehicles Lee, Doo Yong, International Conference on CAD/CAM Robotics and Factories of the Future, pp.139 - 144, 1993-08 |
Scheduling of multimedia traffic for continuous media in packet-switched networks Khil, Ara; Maeng, SeungRyoul, Multimedia Computing and Networking, SPIE, pp.29 - 40, International Society for Optical Engineering (SPIE), 1997-01 |
Scheduling of Petri nets as a multi-objective shortest path problem Wikborg, Uno; Lee, Tae-Eog, IEEE Conference on Automation Science and Engineering, IEEE, 2012-08-22 |
Scheduling of Primary Steelmaking Processes with an Optimal Control Approach Park, Sunwon, KIChE Spring Meeting, KIChE, 2000-01-01 |
Scheduling of Primary Steelmaking Processes: Part 1. Mathematical Modeling Park, Sunwon, KIChE Spring Meeting, KIChE, 2000-01-01 |
Scheduling of Primary Steelmaking processes: Part II. Environmentally Friendly Scheduling Park, Sunwon, KIChE Spring Meeting, KIChE, 2000-01-01 |
Scheduling of Refinery Processes with An Optimal Control Approach Park, Sunwon, The 8th Congress of Asian Pacific Confederation of Chemical Engineering (APCChE'99), Proceedings on 8th APCChE Congress, 1999-01-01 |
Scheduling of Refinery Processes with An Otpimal Control Approach Park, Sunwon, KIChE Spring Meeting, KIChE, 1999-01-01 |
Scheduling of semi-independent real-time components: Overrun methods and resource holding times Behnam, M.; Shin, Insik; Nolte, T.; Nolin, M., IEEE Symposium on Emerging Technologies and Factory Automation, v.0, no.0, pp.575 - 582, IEEE, 2008-09 |
Scheduling of Shipyard Block Assembly Process using Constraint Satisfaction Problem 김희문; 강장하; 박성수, 한국경영과학회/대한산업공학회 춘계공동학술대회, pp.697 - 703, 2002 |
Scheduling of Steelmaking Processes Considering Environmental Impacts Park, Sunwon, 99 Korea-China Workshop on Process Systems Engineering, pp.127 - 130, 1999-01-01 |
Scheduling of Three-Operation Jobs in a Two-Machine Flow Shop with Mean Flow Time Measure 성창섭, 한국경영과학회, 2006 |
Scheduling Parallel Tasks with Individual Deadlines Chwa, Kyung Yong, Lecture Notes in Computer Science, Algorithms and Computation - 3rd Interantional symposium, ISAAC 1995, Proc., pp.198 - 207, 1995 |
Scheduling pressing processes of battery manufacturing with a genetic algorithm Park, Sang-Su; Lee, Sangwook; Kim, Hyunjung, IEEE International Conference on Automation Science and Engineering, IEEE Robotics and Automation Society, 2020-08-21 |
Scheduling proxy: Enabling adaptive-grained scheduling for global computing system Han J.; Park D., Proceedings - Fifth IEEE/ACM International Workshop on Grid Computing, pp.415 - 420, 2004-11-08 |
Scheduling Reusable Instructions for Power Reduction Hu, J.S.; Vijaykrishnan, N.; Kim, Soontae; Kandemir, M.; Irwin, M.J., Proceedings Design, Automation and Test in Europe Conference and Exhibition, 2004. , v.1, pp.148 - 153, 2004-02 |
Scheduling Scheme for QoS guided Grid Service Han, Y; Kim, B; Youn, ChanHyun, Triangle Symposium on Advanced ICT2010(TriSAI2010), Triangle Symposium on Advanced ICT2010(TriSAI2010), 2010-10-25 |
Discover